Between Tuesday, 1 July 2025 and Saturday, 30 August 2025, the Balgowan/Curry’s Post Bridge across the N3 at N3-4 Km 30.6 (Balgowan/Bosch Hoek) on the N3 Toll Route will be restricted to a single lane for traffic crossing over the N3 while the bridge is being repaired (replacement of a beam is required due to heavy vehicle impact).
N3TC appeals to motorists to approach the construction area with caution. Pay close attention to warning signs and carefully follow all safety instructions.
Please note: Traffic flow on the N3 Toll Route is not expected to be impacted by the maintenance works.
Motorists requiring additional information about the scheduled repair work can obtain verified traffic information and emergency assistance by following @N3Route on X, or by contacting the 24-hour N3 Helpline on 0800 63 43 57.